One of the most
critical components of any process retrofit is the schedule and the
crucial repercussions of unscheduled downtime. Brock’s engineering
specialists have developed a unique methodology and execution
program to minimize changeover disruptions with Zero Downtime.
Brock Solutions has extensive experience
performing commissioning activities in coordination with
engineering, maintenance and operations groups. We can offer both
the experience and systems engineering necessary for proposing a
changeover strategy that ensures that the customer’s existing system
is not compromised or interfered with during the upgrade process.
Our emphasis on designing an effective
Changeover Strategy have proven successful for a variety of
customers in different applications, who have benefited
significantly from these processes.
In many cases, Brock ensures that the
transition from an old to new system is phased-in in stages to
accommodate the demands of a busy productions schedule and the
upgrading process did not interfere with the existing system’s
ability to run and even making certain that each step can be
entirely reversible subject to the customer’s satisfaction.