Synopsis of Stacker/Reclaimer Drives, PLC, and HMI Upgrade

  • Situation: A bucket-wheel-style stacker/reclaimer had been in operation at a provincial fossil-fuel-based power generation's facility for close to 15 years.
  • Issue: Wear and tear-related issues limiting stacker/reclaimer performance. Major issues identtified as obsolete traverse, luff, and slew drives (obtaining replacement parts was both challenging and expensive); and limitations to how and when the stacker/reclaimer operations could be switched from "manual" mode to "auto" mode (caused delays to starting up the overall Coal Handling System in "auto" mode).
  • Technology: ABB ACS 800 drives, GE PLC Series 90-70 controller, Modbus Ethernet, ABB PLC, Ethernet, iFIX.
Stacker/Reclaimer Drives, PLC, and HMI Upgrade
  • Requirement: Drives, PLC, and HMI upgrade.
  • Brock Solutions' Role: Perform the stacker/reclaimer drives, PLC, and HMI upgrade in two phases:
    • Phase 1: Replace the existing traverse, luff, and slew drives with modernized drives
    • Phase 2: Rewrite and modify the existing PLC code in a new Windows-based environment and add a HMI interface to the existing mechanical-based operator consoles
Contact us for the complete project profile, which showcases the solution in greater detail and highlights customer benefits.

US/CAN Toll Free:1-877-702-7625 - Toll: +1-519-571-1522 - info@brocksolutions.com - Contact Form